Legislation Details

File #: 24-4310    Version: 1 Name:
Type: Order Status: Passed
File created: 9/27/2024 In control: Engineering
On agenda: 10/7/2024 Final action: 10/7/2024
Title: ORDER approving Change Order 1 for the ARPA Highway 67 / Tradition Area Regional Sewer Expansion project for an increase of $680,550.00 to incorporate MDOT permit requirements and some additional piping along S. Carr Bridge Road, as recommended by the design engineer, BMA, and the County Engineer, and authorize the Board President to execute the documents. Change order work is 100% eligible for ARPA and MCWI grant funding.
Attachments: 1. CO#1 (Hwy 67-Tradition Sewer)

Title

ORDER approving Change Order 1 for the ARPA Highway 67 / Tradition Area Regional Sewer Expansion project for an increase of $680,550.00 to incorporate MDOT permit requirements and some additional piping along S. Carr Bridge Road, as recommended by the design engineer, BMA, and the County Engineer, and authorize the Board President to execute the documents.  Change order work is 100% eligible for ARPA and MCWI grant funding.