Legislation Details

File #: 25-0413    Version: 1 Name:
Type: Order Status: Passed
File created: 3/3/2025 In control: Engineering
On agenda: 3/10/2025 Final action: 3/10/2025
Title: ORDER approving Change Order No. 3 with Specialty Contractors & Associates, Inc., for a total contract deduction of $101,600.00 reflecting a modified design for the anchor structures used on pipe installation, and authorizing the Board President to execute the same.
Attachments: 1. 25-0413 - CO#3 (entire contract)

Title

ORDER approving Change Order No. 3 with Specialty Contractors & Associates, Inc., for a total contract deduction of $101,600.00 reflecting a modified design for the anchor structures used on pipe installation, and authorizing the Board President to execute the same.