Legislation Details

File #: 25-1647    Version: 1 Name:
Type: Order Status: Passed
File created: 9/2/2025 In control: Engineering
On agenda: 9/8/2025 Final action: 9/8/2025
Title: ORDER approving Change Order 1 with Southern Colonial Construction for the ARPA / MCWI Menge Sewer System project to install additional conduit between the grinder pump and control cabinet for each connection. Change order is an increase of $5,161.20 and grant funds are available for the full cost. Authorize the Board President to execute documents.
Attachments: 1. 15-001-008 CO1 Menge Sewer Southern Colonial 8.26.25 Signed

Title

ORDER approving Change Order 1 with Southern Colonial Construction for the ARPA / MCWI Menge Sewer System project to install additional conduit between the grinder pump and control cabinet for each connection. Change order is an increase of $5,161.20 and grant funds are available for the full cost. Authorize the Board President to execute documents.