Legislation Details

File #: 25-1854    Version: 1 Name:
Type: Order Status: Passed
File created: 9/30/2025 In control: Engineering
On agenda: 10/6/2025 Final action: 10/6/2025
Title: ORDER approving Change Order 2 with Southern Colonial Construction LLC to add a pay item for 3” HDPE bore installation and approximately 990 LF of 3” bore at the quoted price, as recommended by the design engineer Chiniche Engineering & Surveying. Change order will add $28,333.80 to the contract. Grant funds are available for 100% of the cost. Authorize Board President to execute included documents for the Menge Avenue Sewer System Improvement project.
Attachments: 1. 15-001-008 Menge Sewer CO 2_3 inch bore Signed

Title

ORDER approving Change Order 2 with Southern Colonial Construction LLC to add a pay item for 3” HDPE bore installation and approximately 990 LF of 3” bore at the quoted price, as recommended by the design engineer Chiniche Engineering & Surveying. Change order will add $28,333.80 to the contract. Grant funds are available for 100% of the cost. Authorize Board President to execute included documents for the Menge Avenue Sewer System Improvement project.