|
Title:
|
ORDER approving Change Order 3 with Southern Colonial Construction LLC for the addition of two hot taps to the existing 2” force main, as recommended by the design engineer Chiniche Engineering & Surveying. Change order will add $4,917.02 to the contract. Grant funds are available for 100% of the cost. Authorize Board President to execute included documents for the Menge Avenue Sewer System Improvements project.
|