Legislation Details

File #: 25-2069    Version: 1 Name:
Type: Order Status: Passed
File created: 11/3/2025 In control: Engineering
On agenda: 11/10/2025 Final action: 11/10/2025
Title: ORDER approving Change Order No. 2 (final) with Gulf Coast Solutions, LLC., for an increase of $82,712.31, and 14 days on the ARPA/MCWI 355-2-DW5.15, North South Water System Loop Project to incorporate additional piping along Little Fawn Drive, and authorizing the Board Vice President to execute the Change Order and the Close Out Documents as recommended by the Construction Engineer, Pickering Firm, Inc. Grant funding is available for the full amount.
Attachments: 1. CO #2F COVER, 2. 341-2-DW-5.15 Closeout Package

Title

ORDER approving Change Order No. 2 (final) with Gulf Coast Solutions, LLC., for an increase of $82,712.31, and 14 days on the ARPA/MCWI 355-2-DW5.15, North South Water System Loop Project to incorporate additional piping along Little Fawn Drive, and authorizing the Board Vice President to execute the Change Order and the Close Out Documents as recommended by the Construction Engineer, Pickering Firm, Inc. Grant funding is available for the full amount.