Legislation Details

File #: 26-0427    Version: 1 Name:
Type: Order Status: Passed
File created: 3/9/2026 In control: Engineering
On agenda: 3/9/2026 Final action: 3/9/2026
Title: ORDER awarding contract for construction of the Warm Up Arena Extension at the Harrison County Fairgrounds to the lowest and best bidder, Clymer Contracting, in the total amount of $439,870.00, finding that the bid submitted by Twin L Construction was not responsive because it was a bid form for another project and should therefore be rejected, and authorizing the Board President to execute contract documents upon receipt, as recommended by the County Engineer. [DETAILED ORDER FOLLOWS AS ATTACHMENT 1.]
Attachments: 1. 1- Order awarding bid.Clymer Contracting 3-9-26, 2. 2- Proof of Pub - Warm Up Arena Extension, 3. 3-Bid Packet - Warm Up Arena for Calder Co., 4. 4- Bid Packet - Warm Up Arena for Clymer, 5. 5- Bid Packet - Warm Up Arena for DNP, 6. 6- Bid Packet - Warm Up Arena for Hopkins, 7. 7- Bid Packet - Warm Up Arena for Samuel B. Day Construction, 8. 8- Bid Packet - Warm Up Arena for Traxler, 9. 9- Bid Packet - Warm Up Arena for Twin L Construction, 10. 10- Bid Tabulation - Warm Up Arena Extension, 11. TABULATION SHEET-Bid for Warm Up Arena, 12. Sign in Sheet - Warm Up Arena Extension

Title

ORDER awarding contract for construction of the Warm Up Arena Extension at the Harrison County Fairgrounds to the lowest and best bidder, Clymer Contracting, in the total amount of $439,870.00, finding that the bid submitted by Twin L Construction was not responsive because it was a bid form for another project and should therefore be rejected, and authorizing the Board President to execute contract documents upon receipt, as recommended by the County Engineer.

 

                     [DETAILED ORDER FOLLOWS AS ATTACHMENT 1.]